{"id":2369,"date":"2023-02-15T17:29:02","date_gmt":"2023-02-15T17:29:02","guid":{"rendered":"https:\/\/cdih.hr\/?p=2369"},"modified":"2025-06-05T13:39:03","modified_gmt":"2025-06-05T13:39:03","slug":"robotics-in-construction-enhancing-on-site-processes","status":"publish","type":"post","link":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/","title":{"rendered":"Robotics in Construction: Enhancing On-Site Processes"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">For years, the construction industry has been grappling with a shortage of qualified labor, insufficient occupational safety, and rising costs. These challenges have had a significant negative impact on productivity across the sector and its stakeholders, as well as on the general perception and popularity of the industry. While construction is not the only field suffering from low productivity, it is certainly among the last when it comes to embracing change and adopting new technologies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Other industries have long turned to automation and robotics, but this type of modernization in construction has only gained momentum in recent years. With a notable drop in the cost of digital solutions, doors have opened to automating and improving on-site processes through robotic systems, linking construction execution with robotics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Robotics has been gradually developing in construction over the past few years, especially in areas such as manufacturing, prefabrication, and logistics. However, one of the most transformative shifts in the industry is the application of robotics directly on construction sites\u2014particularly for repetitive, hazardous, or physically demanding tasks.<\/p>\n\n\n\n<h5 class=\"wp-block-heading has-text-color has-link-color wp-elements-1\" style=\"color:#0c105e\"><strong>Where Can Robotics Be Applied in Construction?<\/strong><\/h5>\n\n\n\n<p class=\"wp-block-paragraph\">This article explores the most current robotic solutions being used on construction sites\u2014technologies that have brought centuries-old processes to a new level and opened the door to a new way of thinking. Construction robotics can be applied to several on-site processes, such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Building walls and other structural elements<\/strong><\/li>\n\n\n\n<li><strong>Operating autonomous equipment<\/strong> \u2013 Robotics can control autonomous machinery using technologies such as sensors, GPS, and machine learning algorithms. For example, autonomous drones equipped with high-resolution cameras and sensors can quickly and accurately survey construction sites.<\/li>\n\n\n\n<li><strong>Remote operations to reduce on-site workforce<\/strong> \u2013 Remote monitoring and control systems allow human operators to observe robot activity in real time, assess performance, and make necessary adjustments. This helps keep operators in safe locations, reduces site congestion, and lowers the risk of injury.<\/li>\n\n\n\n<li><strong>Performing inspection and monitoring tasks<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h5 class=\"wp-block-heading has-text-color has-link-color wp-elements-2\" style=\"color:#0c105e\"><strong>Dusty Robotics<\/strong><\/h5>\n\n\n\n<p class=\"wp-block-paragraph\">Dusty Robotics develops tools for automated layout of building and mechanical systems. This American company has created a robot capable of printing full-scale floor plans onto concrete or other surfaces\u2014dramatically reducing the time it takes compared to manual layout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Dusty FieldPrinter system requires a file containing movement control points\u2014indicating its location in 2D space. After this setup, a floor plan can be added in DWG or CSV format for printing directly onto the floor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">FieldPrinter can print any combination of points, text, and lines directly from a CAD file. Line styles can be customized to display different layer types, such as wall types or mechanical systems.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n <div class=\"brlbs-cmpnt-container brlbs-cmpnt-content-blocker brlbs-cmpnt-with-individual-styles\" data-borlabs-cookie-content-blocker-id=\"youtube-content-blocker\" data-borlabs-cookie-content=\"PGlmcmFtZSB0aXRsZT0iRmllbGRQcmludGVyIC0gSG93IGl0IFdvcmtzIiB3aWR0aD0iODAwIiBoZWlnaHQ9IjQ1MCIgc3JjPSJodHRwczovL3d3dy55b3V0dWJlLW5vY29va2llLmNvbS9lbWJlZC9jVF9ob3FqOGY0MD9mZWF0dXJlPW9lbWJlZCIgZnJhbWVib3JkZXI9IjAiIGFsbG93PSJhY2NlbGVyb21ldGVyOyBhdXRvcGxheTsgY2xpcGJvYXJkLXdyaXRlOyBlbmNyeXB0ZWQtbWVkaWE7IGd5cm9zY29wZTsgcGljdHVyZS1pbi1waWN0dXJlOyB3ZWItc2hhcmUiIHJlZmVycmVycG9saWN5PSJzdHJpY3Qtb3JpZ2luLXdoZW4tY3Jvc3Mtb3JpZ2luIiBhbGxvd2Z1bGxzY3JlZW4+PC9pZnJhbWU+\"><div class=\"brlbs-cmpnt-cb-preset-c brlbs-cmpnt-cb-youtube\"> <div class=\"brlbs-cmpnt-cb-thumbnail\" style=\"background-image: url('https:\/\/cdih.hr\/wp-content\/uploads\/borlabs-cookie\/1\/yt_cT_hoqj8f40_hqdefault.jpg')\"><\/div> <div class=\"brlbs-cmpnt-cb-main\"> <div class=\"brlbs-cmpnt-cb-play-button\"><\/div> <div class=\"brlbs-cmpnt-cb-content\"> <p class=\"brlbs-cmpnt-cb-description\">You are currently viewing a placeholder content from <strong>YouTube<\/strong>. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.<\/p> <a class=\"brlbs-cmpnt-cb-provider-toggle\" href=\"#\" data-borlabs-cookie-show-provider-information role=\"button\">More Information<\/a> <\/div> <div class=\"brlbs-cmpnt-cb-buttons\"> <a class=\"brlbs-cmpnt-cb-btn\" href=\"#\" data-borlabs-cookie-unblock role=\"button\">Unblock content<\/a> <a class=\"brlbs-cmpnt-cb-btn\" href=\"#\" data-borlabs-cookie-accept-service role=\"button\" style=\"display: inherit\">Accept required service and unblock content<\/a> <\/div> <\/div> <\/div><\/div>\n<\/div><\/figure>\n\n\n\n<h5 class=\"wp-block-heading has-text-color has-link-color wp-elements-3\" style=\"color:#0c105e\"><strong>Boston Dynamics<\/strong><\/h5>\n\n\n\n<p class=\"wp-block-paragraph\">Perhaps the most <em>famous<\/em> construction robot is Boston Dynamics\u2019 \u201cSpot\u201d\u2014often seen at international construction expos. While its dog-like gait is a spectacle in itself, Spot plays a much more serious role in construction tasks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Potential uses of Spot on construction sites include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Monitoring site progress<\/strong> \u2013 Frequently capturing 360\u00b0 photos and videos for documentation and progress tracking, which can then be integrated into site records and used to automate reporting.<\/li>\n\n\n\n<li><strong>BIM model vs. real-world comparison<\/strong> \u2013 When equipped with a laser scanner and a programmed path, Spot can collect highly accurate 3D data to monitor construction progress. These scans can be compared with the BIM model to detect clashes early and reduce costly rework.<\/li>\n\n\n\n<li><strong>Worker safety and site security<\/strong> \u2013 Spot can explore restricted or hazardous areas, allowing workers to avoid potential injury. The collected data can be integrated into the BIM model to flag high-risk zones on-site.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n <div class=\"brlbs-cmpnt-container brlbs-cmpnt-content-blocker brlbs-cmpnt-with-individual-styles\" data-borlabs-cookie-content-blocker-id=\"youtube-content-blocker\" data-borlabs-cookie-content=\"PGlmcmFtZSB0aXRsZT0iU3BvdCBvbiBTaXRlOiBDb25zdHJ1Y3Rpb24gU29sdXRpb24iIHdpZHRoPSI4MDAiIGhlaWdodD0iNDUwIiBzcmM9Imh0dHBzOi8vd3d3LnlvdXR1YmUtbm9jb29raWUuY29tL2VtYmVkLzBOWUpfOUZJSFpBP2ZlYXR1cmU9b2VtYmVkIiBmcmFtZWJvcmRlcj0iMCIgYWxsb3c9ImFjY2VsZXJvbWV0ZXI7IGF1dG9wbGF5OyBjbGlwYm9hcmQtd3JpdGU7IGVuY3J5cHRlZC1tZWRpYTsgZ3lyb3Njb3BlOyBwaWN0dXJlLWluLXBpY3R1cmU7IHdlYi1zaGFyZSIgcmVmZXJyZXJwb2xpY3k9InN0cmljdC1vcmlnaW4td2hlbi1jcm9zcy1vcmlnaW4iIGFsbG93ZnVsbHNjcmVlbj48L2lmcmFtZT4=\"><div class=\"brlbs-cmpnt-cb-preset-c brlbs-cmpnt-cb-youtube\"> <div class=\"brlbs-cmpnt-cb-thumbnail\" style=\"background-image: url('https:\/\/cdih.hr\/wp-content\/uploads\/borlabs-cookie\/1\/yt_0NYJ_9FIHZA_hqdefault.jpg')\"><\/div> <div class=\"brlbs-cmpnt-cb-main\"> <div class=\"brlbs-cmpnt-cb-play-button\"><\/div> <div class=\"brlbs-cmpnt-cb-content\"> <p class=\"brlbs-cmpnt-cb-description\">You are currently viewing a placeholder content from <strong>YouTube<\/strong>. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.<\/p> <a class=\"brlbs-cmpnt-cb-provider-toggle\" href=\"#\" data-borlabs-cookie-show-provider-information role=\"button\">More Information<\/a> <\/div> <div class=\"brlbs-cmpnt-cb-buttons\"> <a class=\"brlbs-cmpnt-cb-btn\" href=\"#\" data-borlabs-cookie-unblock role=\"button\">Unblock content<\/a> <a class=\"brlbs-cmpnt-cb-btn\" href=\"#\" data-borlabs-cookie-accept-service role=\"button\" style=\"display: inherit\">Accept required service and unblock content<\/a> <\/div> <\/div> <\/div><\/div>\n<\/div><\/figure>\n\n\n\n<h5 class=\"wp-block-heading has-text-color has-link-color wp-elements-4\" style=\"color:#0c105e\"><strong>Semi-Automated Masonry (SAM) System<\/strong><\/h5>\n\n\n\n<p class=\"wp-block-paragraph\">Construction Robotics has developed the SAM system to help reduce costs, increase productivity, and improve the quality of masonry work. The system automates physically intensive tasks like lifting and placing bricks and applying mortar. Human workers focus on precise positioning, cleaning excess mortar, and monitoring the process.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n <div class=\"brlbs-cmpnt-container brlbs-cmpnt-content-blocker brlbs-cmpnt-with-individual-styles\" data-borlabs-cookie-content-blocker-id=\"youtube-content-blocker\" data-borlabs-cookie-content=\"PGlmcmFtZSB0aXRsZT0iQ29uc3RydWN0aW9uIFJvYm90aWNzIE1VTEUgYW5kIFNBTSBWaWRlbyIgd2lkdGg9IjgwMCIgaGVpZ2h0PSI0NTAiIHNyYz0iaHR0cHM6Ly93d3cueW91dHViZS1ub2Nvb2tpZS5jb20vZW1iZWQvQ0NUZmF2bnRtLWs\/c3RhcnQ9MzgmZmVhdHVyZT1vZW1iZWQiIGZyYW1lYm9yZGVyPSIwIiBhbGxvdz0iYWNjZWxlcm9tZXRlcjsgYXV0b3BsYXk7IGNsaXBib2FyZC13cml0ZTsgZW5jcnlwdGVkLW1lZGlhOyBneXJvc2NvcGU7IHBpY3R1cmUtaW4tcGljdHVyZTsgd2ViLXNoYXJlIiByZWZlcnJlcnBvbGljeT0ic3RyaWN0LW9yaWdpbi13aGVuLWNyb3NzLW9yaWdpbiIgYWxsb3dmdWxsc2NyZWVuPjwvaWZyYW1lPg==\"><div class=\"brlbs-cmpnt-cb-preset-c brlbs-cmpnt-cb-youtube\"> <div class=\"brlbs-cmpnt-cb-thumbnail\" style=\"background-image: url('https:\/\/cdih.hr\/wp-content\/uploads\/borlabs-cookie\/1\/yt_CCTfavntm-k_hqdefault.jpg')\"><\/div> <div class=\"brlbs-cmpnt-cb-main\"> <div class=\"brlbs-cmpnt-cb-play-button\"><\/div> <div class=\"brlbs-cmpnt-cb-content\"> <p class=\"brlbs-cmpnt-cb-description\">You are currently viewing a placeholder content from <strong>YouTube<\/strong>. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.<\/p> <a class=\"brlbs-cmpnt-cb-provider-toggle\" href=\"#\" data-borlabs-cookie-show-provider-information role=\"button\">More Information<\/a> <\/div> <div class=\"brlbs-cmpnt-cb-buttons\"> <a class=\"brlbs-cmpnt-cb-btn\" href=\"#\" data-borlabs-cookie-unblock role=\"button\">Unblock content<\/a> <a class=\"brlbs-cmpnt-cb-btn\" href=\"#\" data-borlabs-cookie-accept-service role=\"button\" style=\"display: inherit\">Accept required service and unblock content<\/a> <\/div> <\/div> <\/div><\/div>\n<\/div><\/figure>\n\n\n\n<h5 class=\"wp-block-heading has-text-color has-link-color has-medium-font-size wp-elements-5\" style=\"color:#0c105e\"><strong>Hadrian X<\/strong><\/h5>\n\n\n\n<p class=\"wp-block-paragraph\">Developed by Fastbrick Robotics, Hadrian X is a bricklaying robot capable of placing 1,000 bricks per hour. This robot can construct a full family house in just two days\u2014including channels for electrical and plumbing systems, and spaces for doors and windows.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n <div class=\"brlbs-cmpnt-container brlbs-cmpnt-content-blocker brlbs-cmpnt-with-individual-styles\" data-borlabs-cookie-content-blocker-id=\"youtube-content-blocker\" data-borlabs-cookie-content=\"PGlmcmFtZSB0aXRsZT0iSGFkcmlhbiBYIENvbXBsZXRlcyBGaXJzdCBDb21tZXJjaWFsIEJ1aWxkIHwgRkJSIiB3aWR0aD0iODAwIiBoZWlnaHQ9IjQ1MCIgc3JjPSJodHRwczovL3d3dy55b3V0dWJlLW5vY29va2llLmNvbS9lbWJlZC8wdUF6U1lMNVJTST9zdGFydD0yNDUmZmVhdHVyZT1vZW1iZWQiIGZyYW1lYm9yZGVyPSIwIiBhbGxvdz0iYWNjZWxlcm9tZXRlcjsgYXV0b3BsYXk7IGNsaXBib2FyZC13cml0ZTsgZW5jcnlwdGVkLW1lZGlhOyBneXJvc2NvcGU7IHBpY3R1cmUtaW4tcGljdHVyZTsgd2ViLXNoYXJlIiByZWZlcnJlcnBvbGljeT0ic3RyaWN0LW9yaWdpbi13aGVuLWNyb3NzLW9yaWdpbiIgYWxsb3dmdWxsc2NyZWVuPjwvaWZyYW1lPg==\"><div class=\"brlbs-cmpnt-cb-preset-c brlbs-cmpnt-cb-youtube\"> <div class=\"brlbs-cmpnt-cb-thumbnail\" style=\"background-image: url('https:\/\/cdih.hr\/wp-content\/uploads\/borlabs-cookie\/1\/yt_0uAzSYL5RSI_hqdefault.jpg')\"><\/div> <div class=\"brlbs-cmpnt-cb-main\"> <div class=\"brlbs-cmpnt-cb-play-button\"><\/div> <div class=\"brlbs-cmpnt-cb-content\"> <p class=\"brlbs-cmpnt-cb-description\">You are currently viewing a placeholder content from <strong>YouTube<\/strong>. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.<\/p> <a class=\"brlbs-cmpnt-cb-provider-toggle\" href=\"#\" data-borlabs-cookie-show-provider-information role=\"button\">More Information<\/a> <\/div> <div class=\"brlbs-cmpnt-cb-buttons\"> <a class=\"brlbs-cmpnt-cb-btn\" href=\"#\" data-borlabs-cookie-unblock role=\"button\">Unblock content<\/a> <a class=\"brlbs-cmpnt-cb-btn\" href=\"#\" data-borlabs-cookie-accept-service role=\"button\" style=\"display: inherit\">Accept required service and unblock content<\/a> <\/div> <\/div> <\/div><\/div>\n<\/div><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Despite the presence of such cutting-edge technology, the application of robotics and digital tools on Croatian construction sites remains limited at this point. However, pilot projects developed at universities or promoted through private sector initiatives are promising signs of growing awareness.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">One such initiative is the <strong>ASAP Project<\/strong> \u2013 <em>Autonomous System for Assessment and Prediction of Infrastructure Integrity<\/em>, a collaboration between three faculties at the University of Zagreb: the Faculty of Civil Engineering (GF), the Faculty of Mechanical Engineering and Naval Architecture (FSB), and the Faculty of Electrical Engineering and Computing (FER).<\/p>\n\n\n\n<div style=\"height:14px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Author<\/strong>: Kristijan Vilibi\u0107, mag.ing.aedif.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For years, the construction industry has been grappling with a shortage of qualified labor, insufficient occupational safety, and rising costs. &#8230;<\/p>\n","protected":false},"author":3,"featured_media":2370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-2369","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Robotics in Construction: Enhancing On-Site Processes - Centar za digitalnu izgradnju Hrvatska<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Robotics in Construction: Enhancing On-Site Processes - Centar za digitalnu izgradnju Hrvatska\" \/>\n<meta property=\"og:description\" content=\"For years, the construction industry has been grappling with a shortage of qualified labor, insufficient occupational safety, and rising costs. ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/\" \/>\n<meta property=\"og:site_name\" content=\"Centar za digitalnu izgradnju Hrvatska\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Centar-za-digitalnu-izgradnju-Hrvatska-102948009161025\" \/>\n<meta property=\"article:published_time\" content=\"2023-02-15T17:29:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-05T13:39:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdih.hr\/wp-content\/uploads\/2025\/06\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Monika Mlaki\u0107\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Monika Mlaki\u0107\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/\"},\"author\":{\"name\":\"Monika Mlaki\u0107\",\"@id\":\"https:\\\/\\\/cdih.hr\\\/#\\\/schema\\\/person\\\/a7d8d9d30d2b78a68dee0eb95167157f\"},\"headline\":\"Robotics in Construction: Enhancing On-Site Processes\",\"datePublished\":\"2023-02-15T17:29:02+00:00\",\"dateModified\":\"2025-06-05T13:39:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/\"},\"wordCount\":821,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cdih.hr\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/\",\"url\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/\",\"name\":\"Robotics in Construction: Enhancing On-Site Processes - Centar za digitalnu izgradnju Hrvatska\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/cdih.hr\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png\",\"datePublished\":\"2023-02-15T17:29:02+00:00\",\"dateModified\":\"2025-06-05T13:39:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/cdih.hr\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png\",\"contentUrl\":\"https:\\\/\\\/cdih.hr\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png\",\"width\":1200,\"height\":1200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cdih.hr\\\/en\\\/robotics-in-construction-enhancing-on-site-processes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Po\u010detna stranica\",\"item\":\"https:\\\/\\\/cdih.hr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Robotics in Construction: Enhancing On-Site Processes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cdih.hr\\\/#website\",\"url\":\"https:\\\/\\\/cdih.hr\\\/\",\"name\":\"Centar za digitalnu izgradnju Hrvatska\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cdih.hr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cdih.hr\\\/#organization\",\"name\":\"Centar za digitalnu izgradnju Hrvatska\",\"url\":\"https:\\\/\\\/cdih.hr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cdih.hr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cdih.hr\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/cdi-logo.svg\",\"contentUrl\":\"https:\\\/\\\/cdih.hr\\\/wp-content\\\/uploads\\\/2022\\\/07\\\/cdi-logo.svg\",\"width\":255,\"height\":64,\"caption\":\"Centar za digitalnu izgradnju Hrvatska\"},\"image\":{\"@id\":\"https:\\\/\\\/cdih.hr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Centar-za-digitalnu-izgradnju-Hrvatska-102948009161025\",\"https:\\\/\\\/www.instagram.com\\\/cdi_hr\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/centar-za-digitalnu-izgradnju-hrvatska\\\/?viewAsMember=true\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cdih.hr\\\/#\\\/schema\\\/person\\\/a7d8d9d30d2b78a68dee0eb95167157f\",\"name\":\"Monika Mlaki\u0107\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38acd391aef24ec5c42af8c5769d4a3fc276036b4c556aaaf3e72d7aee415373?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38acd391aef24ec5c42af8c5769d4a3fc276036b4c556aaaf3e72d7aee415373?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/38acd391aef24ec5c42af8c5769d4a3fc276036b4c556aaaf3e72d7aee415373?s=96&d=mm&r=g\",\"caption\":\"Monika Mlaki\u0107\"},\"url\":\"https:\\\/\\\/cdih.hr\\\/en\\\/author\\\/monika\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Robotics in Construction: Enhancing On-Site Processes - Centar za digitalnu izgradnju Hrvatska","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/","og_locale":"en_US","og_type":"article","og_title":"Robotics in Construction: Enhancing On-Site Processes - Centar za digitalnu izgradnju Hrvatska","og_description":"For years, the construction industry has been grappling with a shortage of qualified labor, insufficient occupational safety, and rising costs. ...","og_url":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/","og_site_name":"Centar za digitalnu izgradnju Hrvatska","article_publisher":"https:\/\/www.facebook.com\/Centar-za-digitalnu-izgradnju-Hrvatska-102948009161025","article_published_time":"2023-02-15T17:29:02+00:00","article_modified_time":"2025-06-05T13:39:03+00:00","og_image":[{"width":1200,"height":1200,"url":"https:\/\/cdih.hr\/wp-content\/uploads\/2025\/06\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png","type":"image\/png"}],"author":"Monika Mlaki\u0107","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Monika Mlaki\u0107","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/#article","isPartOf":{"@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/"},"author":{"name":"Monika Mlaki\u0107","@id":"https:\/\/cdih.hr\/#\/schema\/person\/a7d8d9d30d2b78a68dee0eb95167157f"},"headline":"Robotics in Construction: Enhancing On-Site Processes","datePublished":"2023-02-15T17:29:02+00:00","dateModified":"2025-06-05T13:39:03+00:00","mainEntityOfPage":{"@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/"},"wordCount":821,"commentCount":0,"publisher":{"@id":"https:\/\/cdih.hr\/#organization"},"image":{"@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/#primaryimage"},"thumbnailUrl":"https:\/\/cdih.hr\/wp-content\/uploads\/2025\/06\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/","url":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/","name":"Robotics in Construction: Enhancing On-Site Processes - Centar za digitalnu izgradnju Hrvatska","isPartOf":{"@id":"https:\/\/cdih.hr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/#primaryimage"},"image":{"@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/#primaryimage"},"thumbnailUrl":"https:\/\/cdih.hr\/wp-content\/uploads\/2025\/06\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png","datePublished":"2023-02-15T17:29:02+00:00","dateModified":"2025-06-05T13:39:03+00:00","breadcrumb":{"@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/#primaryimage","url":"https:\/\/cdih.hr\/wp-content\/uploads\/2025\/06\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png","contentUrl":"https:\/\/cdih.hr\/wp-content\/uploads\/2025\/06\/Dark-Blue-Purple-Abstract-Virtual-Business-Conference-Zoom-Background-Objava-na-servisu-LinkedIn-3.png","width":1200,"height":1200},{"@type":"BreadcrumbList","@id":"https:\/\/cdih.hr\/en\/robotics-in-construction-enhancing-on-site-processes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Po\u010detna stranica","item":"https:\/\/cdih.hr\/"},{"@type":"ListItem","position":2,"name":"Robotics in Construction: Enhancing On-Site Processes"}]},{"@type":"WebSite","@id":"https:\/\/cdih.hr\/#website","url":"https:\/\/cdih.hr\/","name":"Centar za digitalnu izgradnju Hrvatska","description":"","publisher":{"@id":"https:\/\/cdih.hr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cdih.hr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cdih.hr\/#organization","name":"Centar za digitalnu izgradnju Hrvatska","url":"https:\/\/cdih.hr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cdih.hr\/#\/schema\/logo\/image\/","url":"https:\/\/cdih.hr\/wp-content\/uploads\/2022\/07\/cdi-logo.svg","contentUrl":"https:\/\/cdih.hr\/wp-content\/uploads\/2022\/07\/cdi-logo.svg","width":255,"height":64,"caption":"Centar za digitalnu izgradnju Hrvatska"},"image":{"@id":"https:\/\/cdih.hr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Centar-za-digitalnu-izgradnju-Hrvatska-102948009161025","https:\/\/www.instagram.com\/cdi_hr\/","https:\/\/www.linkedin.com\/company\/centar-za-digitalnu-izgradnju-hrvatska\/?viewAsMember=true"]},{"@type":"Person","@id":"https:\/\/cdih.hr\/#\/schema\/person\/a7d8d9d30d2b78a68dee0eb95167157f","name":"Monika Mlaki\u0107","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/38acd391aef24ec5c42af8c5769d4a3fc276036b4c556aaaf3e72d7aee415373?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/38acd391aef24ec5c42af8c5769d4a3fc276036b4c556aaaf3e72d7aee415373?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/38acd391aef24ec5c42af8c5769d4a3fc276036b4c556aaaf3e72d7aee415373?s=96&d=mm&r=g","caption":"Monika Mlaki\u0107"},"url":"https:\/\/cdih.hr\/en\/author\/monika\/"}]}},"_links":{"self":[{"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/posts\/2369","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/comments?post=2369"}],"version-history":[{"count":0,"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/posts\/2369\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/media\/2370"}],"wp:attachment":[{"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/media?parent=2369"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/categories?post=2369"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cdih.hr\/en\/wp-json\/wp\/v2\/tags?post=2369"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}